30 Jul Two Aquarius SP 70 Batching Plants working side by side at SAS Infra, Narsingi Circle, Hyderabad, commissioned in March 2018
Posted at 10:28h
in Success-stories
Our SP Series Stationary Batching Plant has an optimal loading height and a robust and reliable design which meets and exceeds the needs of the RMC Industry and the Infra sector.
The SP Series is available in production capacities up to 240 m3/hr and is also the preferred option for Hydel projects and Precast factories.